Drilling
The first step to installing ground source heat pumps is using drill rigs to dig deep into the ground. There the temperature is warmer than air in the winter and cooler than air in the summer, hence the geothermal unit’s efficiency. After digging to the desired depth, high density polyethylene piping is loaded into the well and grouted with a chemical mixture designed to transfer heat.
#5052b5